Hiring Construction Toilets: A Site Setup Checklist

Summary

Prepare the project requirements, site access and service plan before ordering construction toilets.

DougOwner & Director

Published 20 July 2022 · Updated October 2026

On this page
  1. Confirm the amenities requirement
  2. Choose self-contained or sewer-connected
  3. Check the location and access
  4. Set the service routine
  5. Plan extensions and collection
  6. Questions
very high photo of construction machinery on a large worksite

Before ordering construction toilets, establish what facilities the project requires and where they can remain usable through the build. The hire enquiry should include more than the site address.

Confirm the amenities requirement

Have the responsible site team assess workforce, project value, layout and access, including designated female facilities where required. Do not assume a standard worker ratio or one hired unit establishes compliance. Our Queensland construction amenities guide links to the current WorkSafe guidance.

Choose self-contained or sewer-connected

A standard construction toilet works without a sewer connection and includes fortnightly servicing. A sewer-connect unit needs suitable water and sewer connections handled by your plumber. It avoids routine holding-tank pump-outs but still needs cleaning and supplies.

Compare the connection work and likely duration before choosing. Both products have a 28-day minimum. Delivery and collection are separate from hire.

Check the location and access

Mark the position on the site plan and provide photos of gates, slopes and overhead obstructions. Keep a firm, level location with safe user access. Service vehicles need to reach the toilet after fences, scaffolding and materials are in place.

For upper-floor placement, arrange a safe lifting plan and future servicing access with the site team. Lifting points do not remove the need to assess the lift.

Set the service routine

Fortnightly visits are included for the standard construction product. Discuss weekly or additional paid visits if usage is heavier. Nominate who checks cleanliness, supplies and access between visits.

Tell us when the workforce or layout changes. A service schedule should follow actual use rather than an assumed tank capacity.

Plan extensions and collection

Give the expected start and finish dates when requesting a quote. Contact us if the job runs longer to confirm continued hire and the collection date. For sewer-connect units, arrange disconnection with your plumber before pickup.

Use the portable toilet hire page to compare current products and minimum charges, then send the assessed quantities and site details with your enquiry.

About the author

Doug, Owner & Director

Doug and Deb purchased Poles and Holes in 2002 as its third owners. Doug is the owner and director of the Capalaba business, which was established in 1960 and supplies temporary power poles, portable toilets and site security cameras.

Frequently asked questions

What details are needed to quote construction toilets?
Provide the address, dates, assessed number and type of toilets, expected usage and access information. A site plan and photos help confirm placement and servicing access.
Can I hire a construction toilet for less than four weeks?
You can enquire for a shorter job, but the 28-day minimum charge still applies. Confirm the full hire and delivery cost before booking.