Temporary Power Pole Hire in Sunshine Coast

Poles & Holes services the Sunshine Coast — Caloundra, Maroochydore, Noosa, Nambour, Buderim and the Hinterland — with scheduled deliveries from our Capalaba depot. It's a 90–120 minute run, so Sunshine Coast bookings go out in weekly scheduled drops rather than same-day calls. Energex-approved, family-owned since 1960, fleet in spotless condition.

Updated May 2026

Next Day Delivery
Energex Approved
Coastal Specialists
Map preview
Depot Location
Dispatching to Sunshine Coast daily
12+ Years
Servicing SEQ
15,000+
Sites Powered
4,000+
Active Accounts
4.9/5
Google Rating

Temporary & Permanent Power Poles in Sunshine Coast

The Sunshine Coast is in a sustained construction upswing, driven by strong population migration, the Maroochydore CBD redevelopment, and ongoing residential land releases in growth corridors like Caloundra South, Palmview and Aura. From beachside renovations in Noosa and Mooloolaba to new estates in Beerwah and Landsborough, builders across the region rely on fast, compliant temporary power. Poles and Holes has been supplying builders' site power poles across South East Queensland since 1960, with our own crane trucks and in-house electricians handling every step from Energex paperwork to on-site installation.

We deliver temporary and permanent power pole installations across the Sunshine Coast from our Capalaba depot, with most poles installed within 48 hours of booking. A distance surcharge applies beyond our standard 40 km zone to cover the return trips involved. Portaloo and security camera hire on the Sunshine Coast is available by enquiry only — call (07) 3367 2237 or email admin@polesandholes.com.au and we'll let you know if we can support your site.

Technical Specifications

Power Poles

Pole Height7.2m (Overhead) / 4.5m (UG)
Amperage40A - 80A Single Phase
Outlets2x 15A + 1x 10A Standard
Lead In Cable25mm XLPE Included

When to book your hire?

Timing is key for site establishment. Here is the recommended schedule for Sunshine Coast builds.

Planning ahead ensures your Sunshine Coast construction site meets all compliance requirements before work begins. Here's the recommended order for booking site services.

2 Weeks Before

Book Your Pole

Energex applications take 3–5 business days to process. Book your temporary power pole early to avoid site-start delays.

1 Week Before

Confirm Site Access

Confirm crane truck access and the exact pole location with our team. Underground service markouts should be complete.

Install Day

Pole Installed

Our crew installs the pole, meter box and connection gear in a single visit. Tested and tagged on the spot.

Lockup

Off-Hire & Pickup

Once permanent power is connected to the house, call us and we'll arrange off-hire and collection of the temporary pole.

Our Reviews

Trusted by the industry

Google Review
Excellent service and really helpful in coordinating the delivery and pick up.
Sonya Keenan
Google Review
Google Review
Great friendly service, Communication was great!
Buddy Randall
Google Review
Google Review
I honestly did not expect this toilet to be suited for royalty. It has a light, it has hand soap, it has toilet paper and it smells great.
Nadine Chapman
Google Review
Google Review
1 call was all it took to go from no power to a pole in an agreed spot with metered power. All happened within the time frame quoted.
Vanessa McGee
Google Review
Google Review
Awesome company, they delivered further out just for me! The facilities are pristine!
Mel's Outdoor Shenanigans
Google Review
Google Review
Poles and Holes had a temp power pole on our site when our builder went into receivership. The team helped out as much as they could.
Rob M
Google Review
Google Review
Perfect service, couldn't recommend a better experience, helped me hitch up the trailer and fix my hitch pin.
Morgan
Google Review
Google Review
The team at Poles and Holes has been super-helpful, I was entirely new to the process of getting a temporary power pole installed.
Jeremy Matthews
Google Review
Google Review
Best temporary builders pole installers in Brisbane. Quick, reliable, and always professional.
Josh Blake
Google Review
Google Review
Would highly recommend these guys. They know what they're doing and get the job done right.
Sarah Mac
Google Review
Google Review
I have used Poles & Holes a number of times now and they have always been reliable and professional. Highly recommend.
Lisa Bourke
Google Review
Google Review
When our builder went into liquidation, Poles & Holes helped us through a difficult time. They were understanding and flexible.
Soren and Nova Madsen
Google Review
Google Review
Always prompt and professional service!
Maria O'Brien
Google Review
Google Review
Always a pleasure dealing with the team at Poles & Holes. Professional service every time.
Innovative Design & Build Group
Google Review
Google Review
I had a pole and toilet for my project. Both were installed on time and picked up promptly when I asked. Great service, will use again.
Allan Donovan
Google Review
Google Review
Fabulous service from these guys. They have been helping us for years and always deliver on time with no fuss.
Jason Neale
Google Review
Google Review
Having never been through building before, their team made the temporary power process simple to understand. Three thumbs up!
Alex
Google Review
Google Review
Professional and friendly staff. They made the whole process simple from start to finish. 100% would recommend.
Dennis Daniel
Google Review
Google Review
Hired a toilet for a party. It was delivered clean and on time. Very easy to deal with.
Jodie Harold
Google Review

Why Sunshine Coast builders choose us

Not sure which products suit your project? Compare our core hire options side by side to find the right combination for your Sunshine Coast build.

FeaturePoles & HolesOthers
Energex Form 2 Paperwork Handled
Own Crane Truck Fleet on Sunshine CoastContractors
Same-Day EWR Lodgement2–3 Days
In-House Licensed ElectriciansSubbed Out

How it works

We've streamlined the hire process for local builders.

Getting started is simple. Our team handles everything from initial consultation to on-site installation, so you can focus on your build.

1. Quote Online

Request a temporary or permanent power pole quote online or by phone. We respond within 2 hours during business hours.

2. Energex Paperwork

We lodge your Energex Form 2 (Electrical Work Request) on your behalf and coordinate site access with you.

3. Sunshine Coast Install

Our crane truck arrives on site. We install the pole, fit the meter box, RCD and outlets — typically within 2–3 hours.

4. Energex Connection

Energex connects the service line within 5–10 business days of install. When you're done, call us for off-hire and pickup.

Servicing All 25+ Sunshine Coast Suburbs

We deliver directly to sites across Sunshine Coast and surrounding areas. Same-day dispatch is available for most suburbs listed below.

Alexandra HeadlandBuderimCaloundraCoolum BeachKawana WatersMaroochydoreMooloolabaNambourNoosa HeadsNoosavillePalmwoodsPeregian BeachSippy DownsSunshine BeachTwin WatersWurtullaBirtinyaPalmviewBeerwahLandsboroughMalenyMontvillePeregian SpringsBli BliMountain Creek

Nearby Service Areas

Building across Sunshine Coast's borders? We cover neighbouring regions from the same Capalaba depot.

Location FAQs

Once Energex has processed the Electrical Work Request (EWR) — typically 3 to 5 business days for a Sunshine Coast site — Poles and Holes can usually install a temporary builders power pole within 48 hours from our Capalaba depot. We lodge the EWR on your behalf, so you don't need to deal with Energex directly. Drive time from Capalaba to Maroochydore is around 90 minutes via the Bruce Highway; hinterland sites in Maleny, Landsborough or Beerwah add 20–30 minutes. After installation, Energex connects the network within 5–10 business days, then your electricity retailer's meter provider attends a few days later to fit the meter — power flows once that meter is in. Call (07) 3367 2237 for urgent Sunshine Coast jobs; same-week installs are routine and we batch deliveries to keep freight efficient.

Yes — Poles and Holes installs temporary and permanent power poles across the Sunshine Coast Hinterland, including Beerwah, Landsborough, Maleny, Nambour, Eumundi and Conondale. The Hinterland sits well beyond our standard 40 km delivery zone from Capalaba, so a $10 per kilometre distance surcharge applies on top of the standard hire rate — that fee covers the four trips every pole hire involves: delivery to site, our return to depot, pickup at end of hire, and our return again. Steep, narrow, or vegetated access is common in the hinterland, so our crew checks crane reach on site and chooses the safest practical placement; we flag any access risk at quote stage. Same Energex network and connection paperwork as the coast — the only difference is longer drive time, which we factor into the install schedule.

Portaloo and security camera hire on the Sunshine Coast is available by enquiry only — the Sunshine Coast sits outside our standard 40 km short-term delivery zone, so we assess each job individually rather than offering off-the-shelf same-day delivery like we do across Brisbane, Logan, Redlands, Ipswich and Moreton Bay. Call (07) 3367 2237 or email admin@polesandholes.com.au with your site or venue address, dates, and what you need (single portaloo, multi-unit event setup, 4G solar camera) and we'll let you know if we can cover the job and quote the freight transparently. Long-term hires for security cameras (84-day minimum) and ongoing builder portaloo hire are usually viable; one-off short-term jobs may need to slot into an existing route. Bundled orders with a power pole are easier to schedule.

Every Sunshine Coast temporary builders power pole from Poles and Holes ships fully kitted out from our Capalaba depot: compliant meter box, RCD safety switch, standard 15A and 10A outlets, full earthing, and test-and-tag certification to Australian Standards AS/NZS 3000 (Wiring Rules) and AS/NZS 3012 (Construction and Demolition Sites). The pole complies with the Queensland Electricity Connection Manual; the test tag stays attached as your evidence of compliance for the first 6 months, after which retesting is the hirer's responsibility. We handle the Energex Form 2 EWR lodgement on your behalf so the network connection is locked in within 5–10 business days of installation, and we email you the EWR number the same day for your electricity retailer account setup. Stayed, stayless, 3-phase and underground variants are all available depending on site requirements.

Start your project.

Get a custom package quote for your Sunshine Coast site in minutes.

Start Your Order