Summary

A field-by-field handover for an existing construction toilet hire, with a worked example for the next supervisor.

The Poles and Holes team

Published 19 November 2026

On this page
  1. Start with the order, then walk to the unit
  2. Separate the service arrangement from the last visit
  3. Leave one named owner for each open request
  4. A handover note you can reuse
Exterior of a Poles and Holes construction site portaloo

The handover note says “portaloo sorted”. On Monday morning there are two units, the usual driveway is behind temporary fencing, and nobody can tell the new supervisor whether the hire company knows about the change. The problem isn’t choosing another toilet. It’s finding out what was agreed for the ones already there.

Use the last few minutes of the outgoing supervisor’s walk-through to make one short record. Give the incoming supervisor the current arrangement, the things that have changed, and the name of the person following each one up.

Start with the order, then walk to the unit

Look up the hire confirmation together. Record the supplier, hire reference, site address and the contact the crew should use for day-to-day questions. Keep the confirmation with the job records so the next supervisor can check the wording themselves. An invoice address or lot number may not tell a driver which entrance the crew actually uses.

Walk from that entrance to the toilet. If two units look alike, describe each by a stable landmark: “beside the site office” is more useful than “on the left”. Note which unit the hire confirmation covers. If the plan and the site disagree, record the difference as a question; don’t pass an assumption to the next person as fact.

Separate the service arrangement from the last visit

Poles & Holes describes fortnightly servicing on its construction-site toilet hire page. For a handover, the useful detail is the arrangement for this unit. Write down what the confirmation says, the last visit you can verify and where you found that date. Leave the next visit as “to confirm” if you have no confirmed date. A regular interval alone doesn’t tell you a truck will arrive on a particular morning.

Check what will be different by the next visit. Perhaps the entrance used for delivery will be occupied by a skip, or the person who normally opens the gate is moving to another project. Give the incoming supervisor responsibility for checking the revised approach with the supplier. Keep access codes out of a note displayed on site.

Leave one named owner for each open request

A request and a confirmed change belong on separate lines. “Asked about collection on Friday; Jamie to check the reply on Thursday” tells the next supervisor what to do. “Collection Friday” can send the crew looking for a replacement before anyone has agreed to collect the first unit. Use the same distinction for a requested move or an extra service.

If you need Poles & Holes to check an arrangement, use the contact page and give the hire reference, site and specific change. If the entrance is the issue, the delivery photo guide explains which views help describe it.

A handover note you can reuse

  • Site and unit — Example Street build; one unit beside the site office
  • Confirmation — Hire reference and confirmation saved in the site file
  • Service — Last documented visit: ___; next confirmed date, if known: ___
  • Access change — Skip due at old gate on ___; approach still to be agreed
  • Open request — Incoming supervisor to check supplier reply by ___
  • Collection — Requested / confirmed / not requested; evidence in ___

Date the note and pass it directly to the incoming supervisor. Ask them to point out the unit, find the hire confirmation and identify the next call they need to make. If they can do those three things, the handover has done its job.