Temporary power pole on a construction site
Serving South East Queensland

Temporary Power Pole Hire
for SE Queensland Builders.

We bridge the gap between the street mains and your trades. Fast, compliant, and reliable temporary builder's supply (TBS) installation.

Trusted by QLD's Leading Builders

Hutchinson Builders
Redland City Council
Resi Homes
OwnIt Homes
Envate

Fast Turnaround

We install within 48 hours of booking. We understand that without power, your site grinds to a halt.

Fully Compliant

All installations meet AS/NZS 3000 wiring rules, Queensland Electricity Connection Manual (QECM), and Energex requirements. EWRs lodged promptly.

63A Power Standard

All poles upgraded to 63 amp supply as standard, meeting modern site demands. Single-phase and three-phase options available.

Transparent Pricing

Flat rate hire fees. No hidden delivery charges or surprise extension costs. Simple invoicing.

What's on the Pole

Every pole comes fully fitted with the following equipment, ready for connection.

63A Power Supply
Meter Box
Safety Switches (RCD)
Circuit Breakers
Weatherproof Outlets
Earthing Equipment

Temporary Power Poles: With Stays vs Without Stays

We supply both stayed and stayless temporary power poles across Brisbane, Gold Coast, and South East Queensland. Choose the configuration that suits your site — whether you have room for metal support stays or need a compact, self-supporting pole for tight builds.

~6m diameter footprint

Temporary Power Poles With Stays

Footprint
~6m dia.
Best For
Open sites
  • Three metal support stays anchor the pole for maximum stability
  • Most common and cost-effective option for residential builds
  • Ideal when you have clear space around the installation point
  • Standard 12-week hire with 63A supply included
Learn more about stayed poles
Coming Soon
concrete~1m² footprintno staysno stays

Temporary Power Poles Without Stays (Stayless)

Footprint
~1m²
Best For
Tight sites
  • Self-supporting pole — no metal support stays needed
  • Compact footprint for narrow lots, duplexes, and tight builds
  • Deep concrete footing provides stability without external stays
  • Standard 12-week hire with 63A supply included
Learn more — coming soon

Which one is right for me?

Have space around the pole site? Choose a stayed pole — it's the most common and cost-effective option for standard residential builds. Working on a tight or narrow block? Our stayless pole option is coming soon — register your interest. Not sure? Get in touch and we'll recommend the best option for your site.

Configure Your Connection

Select your hardware requirements below. Most residential sites require a stayed overhead connection.

01. Connection Type
02. Hardware Specification
Coming Soon
Stay-less
Unsupported pole

Configuration Summary

Your Match

Builder's Site Power Poles

Traditional QLD design with support stays. Our most popular option.

ConnectionOverhead
TypeStayed
Capacity63 amp
View ProductRequest Quote

No payment required now. We'll review your site location first.

The Basics

What is a temporary power pole?

A temporary builder's supply (TBS) acts as the bridge between the street mains and your tradespeople. It's essential while your property is being built.

Who is responsible for what?

  • We (Poles & Holes)Supply hardware, install pole within 48h, lodge EWR safety certificate.
  • Your RetailerManages your account opening & billing. You call them to request connection.
  • The DistributorThe network operator (e.g. Energex). They perform the final physical connection to the street mains.

Process & Timeframes

Business Days
1

Pole Installation

1-2 Days

From the moment you book. We install the pole and lodge the EWR.

2

Retailer Processing

2-3 Days

You call your retailer. They process the request and raise a service order.

3

Network Connection

5-10 Days

Standard timeframe for the energy distributor crew to attend and connect.

Power On

Your builder can now plug in and start work immediately.

Estimated Costs

To Your Retailer
Estimated connection fees charged by your electricity retailer (varies).
*Normally $577.86
Covers 2 visits by the Energex truck and crew.
Included in our hire fee
Delivery & Setup
Safety Certificate (EWR)
12 Weeks Rental
Final Removal

Site Requirements

We need a 2.5m wide path to the installation point for our crane truck.

Place a visible stake or spray mark where you want the pole installed.

2m clearance around the pole site, free of rubbish and vegetation.

Mark the location to avoid underground services (gas, water, phone lines).

A 1,300mm deep hole will be dug for the pole footing.

3 support stays installed with a 2m radius from the pole base (stayless options coming soon).

3m exclusion zone around the pole is required once erected.

Service cables must not cross neighbouring properties.

Weather & Access

  • Rain and wet weather can restrict site access and delay installation.
  • Clear, unhindered access to meter areas is required — the energy company may charge for wasted trips.

After the Build

Once permanent power is connected, close your temporary account with your retailer and call us for pole pickup.

Need to completely remove the connection?

If the wires on the temporary pole are not being transferred to a permanent supply, the account holder must request a “Supply Abolishment” through their electricity retailer. Once the wires and meter have been removed from the temporary pole, contact Poles and Holes and we will arrange off-hire and pickup.

⚠ Important: Premises must be vacant on removal day. Do not begin demolition until Energex confirms in writing that the removal of the service line is complete.

Need a permanent solution?

Once your build is complete, you may need a permanent private power pole installed or an existing one replaced. We also offer permanent power pole installation with Energex approved galvanised steel power poles engineered for 50+ year lifespans.

Permanent Poles

Delivery & Service Area

We service all of South East Queensland from our Capalaba depot.

Standard Delivery Area

Free delivery within 40km of our Capalaba depot. Covers all of Brisbane, Gold Coast, Ipswich, and surrounding areas.

Extended Delivery

$10/km beyond 40km. This covers four trips: delivery and return, plus pickup and return. Sunshine Coast and beyond available.

Installation Timeline

Pole installed within 48 hours of booking. Allow 5–10 business days for Energex to complete the final connection to the street mains.

Perfect For

Temporary power solutions for every type of build.

New Home Builds

Power your trades from day one with compliant, fast-install temporary supply.

Knockdown Rebuilds

Avoid costly Supply Abolishment fees — save $700–$2,000 with a temp pole.

Renovations

Keep the lights on during major renos when permanent supply needs disconnecting.

Commercial Sites

Three-phase supply for larger builds. Scalable power for multi-unit developments.

Customer Testimonials

What builders and homeowners say about our service.

Best temporary builders pole installers in Brisbane. Quick, reliable, and always professional.

Josh BlakeGoogle Review

Would highly recommend these guys. They know what they're doing and get the job done right.

Sarah MacGoogle Review

I have used Poles & Holes a number of times now and they have always been reliable and professional. Highly recommend.

Lisa BourkeGoogle Review

When our builder went into liquidation, Poles & Holes helped us through a difficult time. They were understanding and flexible.

Soren and Nova MadsenGoogle Review

Always prompt and professional service!

Maria O'BrienGoogle Review

Always a pleasure dealing with the team at Poles & Holes. Professional service every time.

Innovative Design & Build GroupGoogle Review

I had a pole and toilet for my project. Both were installed on time and picked up promptly when I asked. Great service, will use again.

Allan DonovanGoogle Review

Fabulous service from these guys. They have been helping us for years and always deliver on time with no fuss.

Jason NealeGoogle Review

Having never been through building before, their team made the temporary power process simple to understand. Three thumbs up!

AlexGoogle Review

Professional and friendly staff. They made the whole process simple from start to finish. 100% would recommend.

Dennis DanielGoogle Review

Hired a toilet for a party. It was delivered clean and on time. Very easy to deal with.

Jodie HaroldGoogle Review

Frequently Asked Questions

Common questions about getting power to your site.

How do Poles & Holes know to pick up the pole at the end of the job?
When your project wraps up, just let us know and we'll arrange collection. If you don't require permanent power and simply want the pole removed, we can handle that too.
How much notice do I need to book a pole?
We recommend at least 3–5 business days' notice to lock in your preferred delivery date. For urgent jobs, give us a call and we'll do our best to accommodate.
How much space is needed for delivery?
We need clear access for our truck and room to safely install the pole and stays. Please ensure the area is free of obstructions and underground services are marked.
What happens if we can't install the pole where you prefer?
We'll always try to position the pole where requested. If site conditions prevent it (for example, underground services or limited access), our installers will choose the safest and most practical alternative location.
What is our standard delivery area for temporary builders pole hire?
We deliver across Brisbane, the Gold Coast, Ipswich, and surrounding South East Queensland suburbs. Deliveries outside our usual zone may attract additional charges.
Will the pole be delivered on the exact date I specify?
We do our best to meet your requested date. However, delivery can sometimes be impacted by workload, weather, or site readiness. If your site isn't ready when we arrive, a call-out fee may apply.
Are there any charges from the retailer?
Yes. The retailer will send you bills for electricity usage and may also apply account or connection fees, depending on their terms.
Can there be an unforeseen charge levied by Energex for a 3-phase connection?
Yes. While the standard connection fee applies in most cases, Energex may add extra costs if your job requires additional infrastructure or traffic control.
Can we start the connection process early with Energex?
In some cases, yes. We can lodge paperwork with Energex before the pole is physically installed to speed up the process.
Do you provide the meter box?
Yes. All temporary power poles are supplied with a compliant meter box, RCD (safety switch), outlets, and earthing—ready for Energex connection.
How do I advise the Retailer that I wish to open an account?
Simply contact your chosen retailer, provide the EWR number we lodge with Energex, and request a temporary supply account.
How does power get connected to a temporary power pole in Brisbane?
Once your pole is installed, we lodge an Electrical Work Request (EWR) with Energex. You'll then need to contact a retailer (like Origin or AGL) using that EWR number to initiate your power supply. Energex generally connects within 5–10 business days.

Ready to power up?

Book your temporary power pole online in under 2 minutes. We'll handle the installation so you can focus on the build.

No hidden fees. Fast installation turnaround.