Temporary Power Pole Hire
for SE Queensland Builders.
We bridge the gap between the street mains and your trades. Fast, compliant, and reliable temporary builder's supply (TBS) installation.
Trusted by QLD's Leading Builders
Fast Turnaround
We install within 48 hours of booking. We understand that without power, your site grinds to a halt.
Fully Compliant
All installations meet AS/NZS 3000 wiring rules, Queensland Electricity Connection Manual (QECM), and Energex requirements. EWRs lodged promptly.
63A Power Standard
All poles upgraded to 63 amp supply as standard, meeting modern site demands. Single-phase and three-phase options available.
Transparent Pricing
Flat rate hire fees. No hidden delivery charges or surprise extension costs. Simple invoicing.
What's on the Pole
Every pole comes fully fitted with the following equipment, ready for connection.
Temporary Power Poles: With Stays vs Without Stays
We supply both stayed and stayless temporary power poles across Brisbane, Gold Coast, and South East Queensland. Choose the configuration that suits your site — whether you have room for metal support stays or need a compact, self-supporting pole for tight builds.
Temporary Power Poles With Stays
- Three metal support stays anchor the pole for maximum stability
- Most common and cost-effective option for residential builds
- Ideal when you have clear space around the installation point
- Standard 12-week hire with 63A supply included
Temporary Power Poles Without Stays (Stayless)
- Self-supporting pole — no metal support stays needed
- Compact footprint for narrow lots, duplexes, and tight builds
- Deep concrete footing provides stability without external stays
- Standard 12-week hire with 63A supply included
Which one is right for me?
Have space around the pole site? Choose a stayed pole — it's the most common and cost-effective option for standard residential builds. Working on a tight or narrow block? Our stayless pole option is coming soon — register your interest. Not sure? Get in touch and we'll recommend the best option for your site.
Configure Your Connection
Select your hardware requirements below. Most residential sites require a stayed overhead connection.
Configuration Summary
Builder's Site Power Poles
Traditional QLD design with support stays. Our most popular option.
What is a temporary power pole?
A temporary builder's supply (TBS) acts as the bridge between the street mains and your tradespeople. It's essential while your property is being built.
Who is responsible for what?
- We (Poles & Holes)Supply hardware, install pole within 48h, lodge EWR safety certificate.
- Your RetailerManages your account opening & billing. You call them to request connection.
- The DistributorThe network operator (e.g. Energex). They perform the final physical connection to the street mains.
Process & Timeframes
Pole Installation
1-2 DaysFrom the moment you book. We install the pole and lodge the EWR.
Retailer Processing
2-3 DaysYou call your retailer. They process the request and raise a service order.
Network Connection
5-10 DaysStandard timeframe for the energy distributor crew to attend and connect.
Power On
Your builder can now plug in and start work immediately.
Estimated Costs
Site Requirements
We need a 2.5m wide path to the installation point for our crane truck.
Place a visible stake or spray mark where you want the pole installed.
2m clearance around the pole site, free of rubbish and vegetation.
Mark the location to avoid underground services (gas, water, phone lines).
A 1,300mm deep hole will be dug for the pole footing.
3 support stays installed with a 2m radius from the pole base (stayless options coming soon).
3m exclusion zone around the pole is required once erected.
Service cables must not cross neighbouring properties.
Weather & Access
- Rain and wet weather can restrict site access and delay installation.
- Clear, unhindered access to meter areas is required — the energy company may charge for wasted trips.
After the Build
Once permanent power is connected, close your temporary account with your retailer and call us for pole pickup.
Need to completely remove the connection?
If the wires on the temporary pole are not being transferred to a permanent supply, the account holder must request a “Supply Abolishment” through their electricity retailer. Once the wires and meter have been removed from the temporary pole, contact Poles and Holes and we will arrange off-hire and pickup.
⚠ Important: Premises must be vacant on removal day. Do not begin demolition until Energex confirms in writing that the removal of the service line is complete.
Need a permanent solution?
Once your build is complete, you may need a permanent private power pole installed or an existing one replaced. We also offer permanent power pole installation with Energex approved galvanised steel power poles engineered for 50+ year lifespans.
Delivery & Service Area
We service all of South East Queensland from our Capalaba depot.
Standard Delivery Area
Free delivery within 40km of our Capalaba depot. Covers all of Brisbane, Gold Coast, Ipswich, and surrounding areas.
Extended Delivery
$10/km beyond 40km. This covers four trips: delivery and return, plus pickup and return. Sunshine Coast and beyond available.
Installation Timeline
Pole installed within 48 hours of booking. Allow 5–10 business days for Energex to complete the final connection to the street mains.
Perfect For
Temporary power solutions for every type of build.
New Home Builds
Power your trades from day one with compliant, fast-install temporary supply.
Knockdown Rebuilds
Avoid costly Supply Abolishment fees — save $700–$2,000 with a temp pole.
Renovations
Keep the lights on during major renos when permanent supply needs disconnecting.
Commercial Sites
Three-phase supply for larger builds. Scalable power for multi-unit developments.
Customer Testimonials
What builders and homeowners say about our service.
“Best temporary builders pole installers in Brisbane. Quick, reliable, and always professional.”
“Would highly recommend these guys. They know what they're doing and get the job done right.”
“I have used Poles & Holes a number of times now and they have always been reliable and professional. Highly recommend.”
“When our builder went into liquidation, Poles & Holes helped us through a difficult time. They were understanding and flexible.”
“Always prompt and professional service!”
“Always a pleasure dealing with the team at Poles & Holes. Professional service every time.”
“I had a pole and toilet for my project. Both were installed on time and picked up promptly when I asked. Great service, will use again.”
“Fabulous service from these guys. They have been helping us for years and always deliver on time with no fuss.”
“Having never been through building before, their team made the temporary power process simple to understand. Three thumbs up!”
“Professional and friendly staff. They made the whole process simple from start to finish. 100% would recommend.”
“Hired a toilet for a party. It was delivered clean and on time. Very easy to deal with.”
Frequently Asked Questions
Common questions about getting power to your site.
How do Poles & Holes know to pick up the pole at the end of the job?
How much notice do I need to book a pole?
How much space is needed for delivery?
What happens if we can't install the pole where you prefer?
What is our standard delivery area for temporary builders pole hire?
Will the pole be delivered on the exact date I specify?
Are there any charges from the retailer?
Can there be an unforeseen charge levied by Energex for a 3-phase connection?
Can we start the connection process early with Energex?
Do you provide the meter box?
How do I advise the Retailer that I wish to open an account?
How does power get connected to a temporary power pole in Brisbane?
Complete your site setup.
Everything you need for a fully equipped construction site.
Ready to power up?
Book your temporary power pole online in under 2 minutes. We'll handle the installation so you can focus on the build.