3-Phase Power Pole Hire

415V three-phase temporary power for commercial and industrial construction sites. Heavy-duty supply for heavy-duty builds.

Supply
415V 3ϕ
Standard
AS/NZS 3000
Capacity
63A-100A
Installation
48 Hours

Product Overview

Three-phase temporary power poles deliver 415V supply to construction sites that need more than standard single-phase capacity. If your project involves heavy machinery, industrial compressors, large-scale HVAC installation, or commercial fit-outs, a three-phase TBS is the connection you need.

Our three-phase poles are installed by our licensed electricians and include appropriately rated metering, switchgear, and safety devices. The installation meets AS/NZS 3000 standards and we lodge the EWR with Energex on the day of installation. Three-phase connections support 63A to 100A capacity as standard.

The hire fee includes all three-phase hardware, delivery, professional installation, 12 weeks of rental, and full removal. Both stayed and stayless pole designs are available in three-phase — we recommend based on your site space and access conditions. For underground estates, three-phase underground connections are also available.

Safety & Compliance

Three-phase installations require additional safety measures and testing to ensure safe operation at 415V.

  • Three-phase rated hardware and metering
  • AS/NZS 3000 compliant professional installation
  • EWR lodged with Energex for 3-phase connection
  • Safety switch and RCD testing included
  • Suitable for heavy machinery and industrial equipment

How It Works

Typical Timeline
1

Requirements Assessment

Day 1

We confirm your power requirements — load capacity, connection type, and site access. Three-phase installations may require additional Energex coordination.

2

Installation

Day 2-3

Our licensed electricians install the three-phase pole with appropriate metering and switchgear. EWR is lodged with Energex.

3

Energex Connection

5-15 Days

Three-phase connections may take slightly longer for Energex to schedule. Your retailer raises the service order.

Collection

End of hire

When your permanent three-phase supply is connected, we remove the pole and all associated hardware.

Service Coverage

We service all major regions across South East Queensland with fast turnaround times.

Brisbane
Gold Coast
Sunshine Coast
Ipswich
Logan
Moreton Bay
Redlands
Scenic Rim

Frequently Asked Questions

When do I need three-phase power?
Three-phase power is required when your site uses heavy machinery, large compressors, commercial HVAC systems, or industrial equipment that runs on 415V. It’s standard for commercial builds, multi-unit developments, and industrial construction projects.
Is three-phase more expensive than single phase?
Yes. Three-phase poles cost more than single-phase due to the larger pole section, three-phase metering, and heavier-duty switchgear required for 415V supply. Contact us for a quote.
What capacity is available on three-phase poles?
Our standard three-phase poles support 63A to 100A capacity. For larger loads, contact us to discuss your specific requirements — we can arrange custom configurations for major projects.
Does Energex take longer to connect three-phase?
Three-phase connections can take slightly longer — typically 5 to 15 business days compared to 5-10 days for single phase. This depends on Energex crew availability and whether any network upgrades are needed at the street level.
Can I get three-phase on a stayed or stayless pole?
Yes. Both stayed and stayless pole designs are available in three-phase configurations. Stayless three-phase poles are common on commercial sites where space is limited. We recommend based on your site conditions.
What about three-phase underground connections?
Three-phase underground connections are available for estates with underground mains. These involve additional cable and electrician supervision costs. Contact us for a site-specific quote.
$840.00min. hire

ex GST

Minimum hire period84 days
Daily rate$10.00/day

This is the price for the minimum hire period. Extensions beyond 84 days are billed monthly in arrears.

What's Included
  • Three-phase pole hardware
  • 415V metering & switchgear
  • Professional installation
  • EWR safety certificate
  • 12-week rental period
  • Full removal & site restoration

Site Setup Bundle

Add a portaloo to your power pole hire and save 10% on the combo.

View bundle options

Need help choosing?

Not sure which setup suits your site? Our team can advise on the best configuration.