- Home
- Temporary Power Poles
- 3-Phase Power Pole
3-Phase Power Pole Hire
415V three-phase temporary power for commercial and industrial construction sites. Heavy-duty supply for heavy-duty builds.
Three-phase 415V power is essential for commercial and industrial construction sites that require heavy machinery, welding equipment, or large-scale electrical loads. Standard single-phase 240V supply cannot deliver the power capacity needed for tower cranes, large compressors, commercial HVAC installations, or industrial welding rigs. Our three-phase temporary power poles are pre-wired with 415V metering and heavy-duty switchgear, and every installation is fully Energex compliant with an EWR lodged on the day of installation. Three-phase poles are available in both stayed and stayless configurations, and we can also arrange three-phase underground connections for estates with below-ground mains. Whether you are building a warehouse, a multi-unit residential development, or a commercial fitout, a three-phase temporary supply ensures your trades have the power capacity they need from day one.
Product Overview
Fast, Reliable Site Power for Residential Builders
For residential builders, getting power to site quickly and reliably is non-negotiable. Our builder's site power poles are the go-to solution for new home builds, knockdown rebuilds, and renovation projects across South East Queensland. We've been powering building sites since 1960 — we know the process inside and out.
Every builder's pole installation includes:
- Hardware delivery
- Professional installation by our licensed electricians
- Same-day EWR lodgement with Energex
- 12 weeks of rental
- Full removal at the end of the hire
You choose the phase — single phase for standard residential builds or three phase for larger projects — and we handle the rest.
We work with volume builders, owner-builders, and individual contractors across Brisbane, Gold Coast, Sunshine Coast, and Ipswich. Our streamlined booking process means you can have a pole in the ground within 48 hours of confirmation, keeping your build on schedule from day one.
Safety & Compliance
Three-phase installations require additional safety measures and testing to ensure safe operation at 415V.
- Three-phase rated hardware and metering
- AS/NZS 3000 compliant professional installation
- EWR lodged with Energex for 3-phase connection
- Safety switch and RCD testing included
- Suitable for heavy machinery and industrial equipment
How It Works
Requirements Assessment
Day 1We confirm your power requirements — load capacity, connection type, and site access. Three-phase installations may require additional Energex coordination.
Installation
Day 2-3Our licensed electricians install the three-phase pole with appropriate metering and switchgear. EWR is lodged with Energex.
Energex Connects The Pole
5-15 DaysYour retailer raises the service order. Energex then connects the pole to the grid — three-phase connections may take slightly longer to schedule. This is the network connection, not yet live power.
Retailer Installs The Meter
+2-5 DaysYour retailer's meter provider attends a few days after Energex to fit the meter. Power only starts flowing once the meter is in.
Collection
End of hireWhen your permanent three-phase supply is connected, we remove the pole and all associated hardware.
Service Coverage
We service all major regions across South East Queensland with fast turnaround times.
Our fleet covers all of South East Queensland, from the Gold Coast through Brisbane to the Sunshine Coast. Three-phase pole delivery and installation are typically completed within 48 hours of order confirmation. Energex three-phase connections may take slightly longer to schedule than single-phase, so we recommend ordering early in your project timeline.
Have questions about three-phase power pole hire? Here are answers to the most common queries from commercial builders and site managers.
Frequently Asked Questions
When do I need three-phase power?
Is three-phase more expensive than single phase?
What capacity is available on three-phase poles?
Does Energex take longer to connect three-phase?
Can I get three-phase on a stayed or stayless pole?
What about three-phase underground connections?
ex GST
+ from $350.00 delivery
This is the price for the minimum hire period. Extensions beyond 84 days are billed monthly in arrears.
- Three-phase pole hardware
- 415V metering & switchgear
- Professional installation
- EWR safety certificate
- 12-week rental period
- Full removal & site restoration
Site Setup Bundle
Add a portaloo to your power pole hire and save 10% on the combo.
View bundle optionsNeed help choosing?
Not sure which setup suits your site? Our team can advise on the best configuration.
Related Products
Other power pole options that might suit your needs.
Need industrial-grade temporary power?
Get a three-phase power pole installed within 48 hours. Powering commercial and industrial sites across South East Queensland.