Available Now

3-Phase Power Pole Hire

415V three-phase temporary power for commercial and industrial construction sites. Heavy-duty supply for heavy-duty builds.

Supply
415V 3ϕ
Standard
AS/NZS 3000
Capacity
63A-100A
Installation
48 Hours

Three-phase 415V power is essential for commercial and industrial construction sites that require heavy machinery, welding equipment, or large-scale electrical loads. Standard single-phase 240V supply cannot deliver the power capacity needed for tower cranes, large compressors, commercial HVAC installations, or industrial welding rigs. Our three-phase temporary power poles are pre-wired with 415V metering and heavy-duty switchgear, and every installation is fully Energex compliant with an EWR lodged on the day of installation. Three-phase poles are available in both stayed and stayless configurations, and we can also arrange three-phase underground connections for estates with below-ground mains. Whether you are building a warehouse, a multi-unit residential development, or a commercial fitout, a three-phase temporary supply ensures your trades have the power capacity they need from day one.

Product Overview

Fast, Reliable Site Power for Residential Builders

For residential builders, getting power to site quickly and reliably is non-negotiable. Our builder's site power poles are the go-to solution for new home builds, knockdown rebuilds, and renovation projects across South East Queensland. We've been powering building sites since 1960 — we know the process inside and out.

Every builder's pole installation includes:

  • Hardware delivery
  • Professional installation by our licensed electricians
  • Same-day EWR lodgement with Energex
  • 12 weeks of rental
  • Full removal at the end of the hire

You choose the phase — single phase for standard residential builds or three phase for larger projects — and we handle the rest.

We work with volume builders, owner-builders, and individual contractors across Brisbane, Gold Coast, Sunshine Coast, and Ipswich. Our streamlined booking process means you can have a pole in the ground within 48 hours of confirmation, keeping your build on schedule from day one.

Safety & Compliance

Three-phase installations require additional safety measures and testing to ensure safe operation at 415V.

  • Three-phase rated hardware and metering
  • AS/NZS 3000 compliant professional installation
  • EWR lodged with Energex for 3-phase connection
  • Safety switch and RCD testing included
  • Suitable for heavy machinery and industrial equipment

How It Works

Typical Timeline
1

Requirements Assessment

Day 1

We confirm your power requirements — load capacity, connection type, and site access. Three-phase installations may require additional Energex coordination.

2

Installation

Day 2-3

Our licensed electricians install the three-phase pole with appropriate metering and switchgear. EWR is lodged with Energex.

3

Energex Connects The Pole

5-15 Days

Your retailer raises the service order. Energex then connects the pole to the grid — three-phase connections may take slightly longer to schedule. This is the network connection, not yet live power.

4

Retailer Installs The Meter

+2-5 Days

Your retailer's meter provider attends a few days after Energex to fit the meter. Power only starts flowing once the meter is in.

Collection

End of hire

When your permanent three-phase supply is connected, we remove the pole and all associated hardware.

Service Coverage

We service all major regions across South East Queensland with fast turnaround times.

Our fleet covers all of South East Queensland, from the Gold Coast through Brisbane to the Sunshine Coast. Three-phase pole delivery and installation are typically completed within 48 hours of order confirmation. Energex three-phase connections may take slightly longer to schedule than single-phase, so we recommend ordering early in your project timeline.

Brisbane
Gold Coast
Sunshine Coast
Ipswich
Logan
Moreton Bay
Redlands
Scenic Rim

Have questions about three-phase power pole hire? Here are answers to the most common queries from commercial builders and site managers.

Frequently Asked Questions

When do I need three-phase power?
Three-phase power is required when your site uses heavy machinery, large compressors, commercial HVAC systems, or industrial equipment that runs on 415V. It’s standard for commercial builds, multi-unit developments, and industrial construction projects.
Is three-phase more expensive than single phase?
Yes. Three-phase poles cost more than single-phase due to the larger pole section, three-phase metering, and heavier-duty switchgear required for 415V supply. Contact us for a quote.
What capacity is available on three-phase poles?
Our standard three-phase poles support 63A to 100A capacity. For larger loads, contact us to discuss your specific requirements — we can arrange custom configurations for major projects.
Does Energex take longer to connect three-phase?
Three-phase connections can take slightly longer — typically 5 to 15 business days compared to 5-10 days for single phase. This depends on Energex crew availability and whether any network upgrades are needed at the street level.
Can I get three-phase on a stayed or stayless pole?
Yes. Both stayed and stayless pole designs are available in three-phase configurations. Stayless three-phase poles are common on commercial sites where space is limited. We recommend based on your site conditions.
What about three-phase underground connections?
Three-phase underground connections are available for estates with underground mains. These involve additional cable and electrician supervision costs. Contact us for a site-specific quote.
$840.00min. hire

ex GST

+ from $350.00 delivery

Minimum hire period84 days
Daily rate$10.00/day

This is the price for the minimum hire period. Extensions beyond 84 days are billed monthly in arrears.

What's Included
  • Three-phase pole hardware
  • 415V metering & switchgear
  • Professional installation
  • EWR safety certificate
  • 12-week rental period
  • Full removal & site restoration

Site Setup Bundle

Add a portaloo to your power pole hire and save 10% on the combo.

View bundle options

Need help choosing?

Not sure which setup suits your site? Our team can advise on the best configuration.

Mon-Fri 7am-4pm

Need industrial-grade temporary power?

Get a three-phase power pole installed within 48 hours. Powering commercial and industrial sites across South East Queensland.