Available Now

Stayed Power Pole Hire

The traditional Queensland temporary power pole design. Metal stay stabilised, cost-effective, and proven across thousands of building sites.

Pole Type
Stayed
Standard
AS/NZS 3000
Hire Period
12 Weeks
Installation
48 Hours

Product Overview

Fast, Reliable Site Power for Residential Builders

For residential builders, getting power to site quickly and reliably is non-negotiable. Our builder's site power poles are the go-to solution for new home builds, knockdown rebuilds, and renovation projects across South East Queensland. We've been powering building sites since 1960 — we know the process inside and out.

Every builder's pole installation includes:

  • Hardware delivery
  • Professional installation by our licensed electricians
  • Same-day EWR lodgement with Energex
  • 12 weeks of rental
  • Full removal at the end of the hire

You choose the phase — single phase for standard residential builds or three phase for larger projects — and we handle the rest.

We work with volume builders, owner-builders, and individual contractors across Brisbane, Gold Coast, Sunshine Coast, and Ipswich. Our streamlined booking process means you can have a pole in the ground within 48 hours of confirmation, keeping your build on schedule from day one.

Safety & Compliance

Every installation is completed to Australian electrical standards with full documentation to keep your site compliant.

  • Metal support stays anchored to rated ground stakes
  • AS/NZS 3000 compliant installation
  • EWR lodged with Energex on installation day
  • Safety switch testing included
  • Pole positioned clear of build zone and driveways

How It Works

Typical Timeline
1

Book & Site Check

Day 1

We confirm pole and stay anchor positions. The pole needs clear space for metal support stays — roughly 3m radius.

2

Installation

Day 2-3

Our crew installs the pole with metal support stays and anchors. The meter box is fitted and the EWR is lodged.

3

Energex Connects The Pole

5-10 Days

You call your retailer to open an account. Energex then attends to connect the overhead service line from the street to the pole. This is the network connection — not yet live power.

4

Retailer Installs The Meter

+2-5 Days

Your retailer's meter provider attends a few days after Energex to fit the meter. Power only starts flowing once the meter is in.

Removal

End of hire

Once permanent power is connected, we remove the pole, stays, and anchors — restoring the site.

Service Coverage

We service all major regions across South East Queensland with fast turnaround times.

Brisbane
Gold Coast
Sunshine Coast
Ipswich
Logan
Moreton Bay
Redlands
Scenic Rim

Frequently Asked Questions

What is a stayed power pole?
A stayed pole uses diagonal metal support stays anchored to the ground to provide stability. It's the traditional and most common temporary power pole design used across Queensland. The stays prevent the pole from leaning under the weight of the overhead service line.
How much space do the stays require?
The metal support stays extend approximately 2-3 metres from the base of the pole in two or three directions. You'll need a clear area roughly 3 metres radius around the pole position, free of planned building works and vehicle access paths.
Is a stayed pole cheaper than a stayless pole?
Yes. Stayed poles are the most cost-effective option in our range. Stayless poles use a heavier self-supporting design which costs more. For most sites with adequate space, a stayed pole is the recommended choice. Contact us for a quote.
Can I place materials near the metal support stays?
No. The metal support stays must remain clear and unobstructed for safety. Building materials, skip bins, and vehicles should be kept well clear of the stays. Our installer will advise on the exact exclusion zone at installation.
What if I don't have room for stays?
If your site is too tight for metal support stays — for example, a narrow lot or a site where the stays would cross the driveway — we recommend a stayless (self-supporting) power pole instead. We can assess your site and advise.
Are the stays visible during the build?
Yes. The metal support stays are visible and should be marked with high-visibility flagging tape to prevent accidental contact. Our installers fit this as standard. They are removed completely when the pole is collected.
$600.00min. hire

ex GST

+ from $350.00 delivery

Minimum hire period84 days
Daily rate$7.14/day

This is the price for the minimum hire period. Extensions beyond 84 days are billed monthly in arrears.

What's Included
  • Temporary builder's pole (63A)
  • Meter box & safety switches
  • Professional installation
  • EWR safety certificate
  • 12-week rental period
  • Full removal & site restoration

Site Setup Bundle

Add a portaloo to your power pole hire and save 10% on the combo.

View bundle options

Need help choosing?

Not sure which setup suits your site? Our team can advise on the best configuration.

Mon-Fri 7am-4pm

Ready to get your site powered?

Book a stayed power pole today. Fast 48-hour installation across South East Queensland.