Temporary Power Pole Hire for Brisbane & SE Queensland.
Temporary builder’s supply for construction sites across Brisbane and SE QLD. We supply and install the pole, then help you work through the network and retailer connection steps.
To get started
From $950+ GST
12 weeks hire: $600
Standard delivery: $350
Prices exclude GST. Delivery is calculated separately from the site address and may vary outside our 40km standard zone. We confirm the final price after reviewing your site details.
Temporary power pole installations across Brisbane and South East Queensland.
01· What we arrangePole, Connect Application, EWR
What we arrange for your site
Our team installs the pole, arranges the Connect Application and lodges the EWR. Visits by our electricians for connection work are charged separately. Network connection and retailer metering are separate steps.
Site-Confirmed Timing
We confirm delivery after checking your address, access and connection requirements.
Fully Compliant
We install the pole to applicable requirements and lodge the Electrical Work Request (EWR).
63A Power Standard
63 amp single-phase or 63 amp per phase for three-phase supply, selected to suit your builder’s requirements.
Transparent Pricing
Hire and delivery are shown as separate line items, with delivery calculated for your site address.
Temporary power poles we've installed
Stayed builder's supply poles on real sites across South East Queensland.
02· What’s includedOn every pole
What's on the Pole
The pole arrives with the equipment below. Power is available after network connection and metering are complete.
63A Power Supply
Meter Box
Safety Switches (RCD)
Circuit Breakers
Weatherproof Outlets
Earthing Equipment
03· Choose your poleOverhead or underground
Which temporary power pole suits your site?
We supply temporary poles for both overhead and underground connections. Stayed overhead and underground poles are available now; stayless overhead poles are coming soon. Choose the connection to suit the electricity network at your site.
Overhead Power Poles With Stays
Footprint
~4m dia.
Best For
Open sites
Three metal support stays anchor the pole for maximum stability
Most common and cost-effective option for residential builds
Ideal when you have clear space around the installation point
Underground electricity in your street? Choose an underground connection. Connecting to an overhead street line? Our stayed poles are available now, with room needed for the support stays. The planned stayless overhead option is still coming soon. If you're unsure, send us your site details so we can confirm the connection and pole position.
04· Configure & pricePrices ex GST
Choose your connection and see the hire price
Select overhead or underground to match your site, then choose single-phase or three-phase power with your builder or electrician.
05· Site WatchComing soon
Standalone solar setup shown
Site Watch · Coming soon
A camera on your hired temporary power pole.
Our upcoming Site Watch camera will fit to a temporary power pole you hire from us. It will record events only. For continuous 24/7 recording now, choose our standalone solar camera bundle.
A temporary builder's supply (TBS) acts as the bridge between the street mains and your tradespeople. It's essential while your property is being built.
Who is responsible for what?
We (Poles & Holes)Supply and install the quoted pole, arrange the Connect Application and lodge the EWR at the required stages. Our electricians do the connection work; their visits are charged separately.
Your RetailerManages your account opening & billing. You call them to request connection.
The DistributorThe network operator (e.g. Energex). They perform the final physical connection to the street mains.
Process & Timeframes
Timing owner
1
Quote & Site Review
Confirmed by us
We review the address, access, pole configuration and requested project date, then confirm pricing and the next steps.
2
Delivery & Installation
Site specific
We confirm the available delivery and installation window after the quote and site details are approved.
3
Energex Connects The Pole
Provider timing
The network connection is scheduled separately by the relevant provider. Ask them for the current site-specific timeframe.
4
Retailer Installs The Meter
Provider timing
Your retailer or metering provider controls this appointment. Power starts only after all required connection and metering steps are complete.
Power On
Meter is installed — your builder can now plug in and start work.
Estimated Costs
To Your Retailer
Connection and metering charges are set separately by the relevant providers.
Quoted separately
Ask the network, retailer or electrician for current site-specific charges.
Included in the pole service
Delivery quoted separately
Site-specific paperwork confirmed
12-week minimum hire
Final Removal
A single-phase site pole starts at $600 for the 12-week minimum hire and three-phase starts at $840. Standard-zone delivery starts at $350 and is shown as a separate line item. Prices exclude GST; delivery outside the standard zone is calculated from the site address. See the full temporary power pole hire price list for every product.
Allow a clear access path at least 3 m wide for our trucks. Tell us about gates, slopes and overhead obstructions so we can confirm access and placement before booking.
Place a visible stake or spray mark where you want the pole installed.
Keep the installation area clear of rubbish, vegetation and planned work.
Provide underground-service information so the location can be assessed before excavation.
A 1,300mm deep hole will be dug for the pole footing.
3 support stays installed with a 2m radius from the pole base (stayless options coming soon).
Allow 3m working clearance around our stayed pole; electrical-line exclusion requirements are assessed separately.
Service cables must not cross neighbouring properties.
Rain and wet weather can restrict site access and delay installation.
Clear, unhindered access to meter areas is required — the energy company may charge for wasted trips.
After the Build
Once permanent power is connected, close your temporary account with your retailer and call us for pole pickup.
Need to completely remove the connection?
If the wires on the temporary pole are not being transferred to a permanent supply, the account holder must request a “Supply Abolishment” through their electricity retailer. Once the wires and meter have been removed from the temporary pole, contact Poles and Holes and we will arrange off-hire and pickup.
⚠ Important: Premises must be vacant on removal day. Do not begin demolition until Energex confirms in writing that the removal of the service line is complete.
Need a permanent solution?
Once your build is complete, you may need a permanent private power pole installed or an existing one replaced. We also offer permanent power pole installation with galvanised steel options and site-specific installation requirements.
We service all of South East Queensland from our Capalaba depot.
Standard Delivery Area
Standard-zone delivery starts from $350 excluding GST within 40km of our Capalaba depot, covering much of Brisbane, Logan, Redlands, Ipswich and Moreton Bay.
Extended Delivery
Gold Coast and Sunshine Coast are also covered. Enter the site address to calculate delivery outside the standard zone, with any distance surcharge shown separately.
Installation Timeline
We confirm the available delivery and installation window after reviewing your request. Network and retailer connection timing is controlled separately by those providers.
08· ProjectsHomes, renovations, commercial
Temporary power for different projects
Building a home, renovating or managing a commercial site? We confirm the pole and connection type against your project requirements.
New Home Builds
Plan temporary power before your trades start. Allow time for pole installation, network connection and metering.
Knockdown Rebuilds
Avoid costly Supply Abolishment fees — save $700–$2,000 with a temp pole.
Renovations
Keep the lights on during major renos when permanent supply needs disconnecting.
Commercial Sites
Three-phase supply for larger builds. Scalable power for multi-unit developments.
09· ReviewsBuilders and homeowners
What our customers say
Reviews from builders and homeowners who have used Poles & Holes.
“Excellent service and really helpful in coordinating the delivery and pick up.”
Sonya KeenanGoogle Review
“Great friendly service, Communication was great!”
Buddy RandallGoogle Review
“I honestly did not expect this toilet to be suited for royalty. It has a light, it has hand soap, it has toilet paper and it smells great.”
Nadine ChapmanGoogle Review
Read more customer reviews
“1 call was all it took to go from no power to a pole in an agreed spot with metered power. All happened within the time frame quoted.”
Vanessa McGeeGoogle Review
“Awesome company, they delivered further out just for me! The facilities are pristine!”
Mel's Outdoor ShenanigansGoogle Review
“Poles and Holes had a temp power pole on our site when our builder went into receivership. The team helped out as much as they could.”
Rob MGoogle Review
“Perfect service, couldn't recommend a better experience, helped me hitch up the trailer and fix my hitch pin.”
MorganGoogle Review
“The team at Poles and Holes has been super-helpful, I was entirely new to the process of getting a temporary power pole installed.”
Jeremy MatthewsGoogle Review
“Best temporary builders pole installers in Brisbane. Quick, reliable, and always professional.”
Josh BlakeGoogle Review
“Would highly recommend these guys. They know what they're doing and get the job done right.”
Sarah MacGoogle Review
“I have used Poles & Holes a number of times now and they have always been reliable and professional. Highly recommend.”
Lisa BourkeGoogle Review
“When our builder went into liquidation, Poles & Holes helped us through a difficult time. They were understanding and flexible.”
Soren and Nova MadsenGoogle Review
“Always prompt and professional service!”
Maria O'BrienGoogle Review
“Always a pleasure dealing with the team at Poles & Holes. Professional service every time.”
Innovative Design & Build GroupGoogle Review
“I had a pole and toilet for my project. Both were installed on time and picked up promptly when I asked. Great service, will use again.”
Allan DonovanGoogle Review
“Fabulous service from these guys. They have been helping us for years and always deliver on time with no fuss.”
Jason NealeGoogle Review
“Having never been through building before, their team made the temporary power process simple to understand. Three thumbs up!”
AlexGoogle Review
“Professional and friendly staff. They made the whole process simple from start to finish. 100% would recommend.”
Dennis DanielGoogle Review
“Hired a toilet for a party. It was delivered clean and on time. Very easy to deal with.”
Jodie HaroldGoogle Review
10· FAQsTemporary power pole hire
Temporary Power Pole Hire FAQs
Common questions about getting power to your site.
What size pole or power capacity do I need?
Our temporary poles provide 63A single-phase or 63A per phase for three-phase supply. Choose single-phase or three-phase after your builder or licensed electrician assesses the equipment and loads that will run together. We then confirm the connection configuration and site suitability. Stayed and underground options are available; stayless poles are coming soon.
How long is the standard hire period?
The minimum temporary-pole hire is 84 days, or 12 weeks. The minimum charge applies even if the pole is needed for less time. Ask us to confirm the ongoing rate and off-hire arrangements for your quote.
How much notice do I need to book a pole?
Enquire while planning the site, before committing to a date that needs live power. We confirm delivery after reviewing access, availability and the connection requirements. Network connection and metering have separate provider schedules.
How much space is needed for delivery?
Allow a clear access path at least 3 m wide for our trucks. Tell us about gates, slopes and overhead obstructions so we can confirm access and placement before booking. Stayed poles have three anchors about 2 m from the pole base. Allow the working space shown in our installation guide; electrical-line exclusion requirements are assessed separately.
How does power get connected to a temporary power pole in Brisbane?
We install the agreed pole configuration, arrange the Connect Application and lodge the Electrical Work Request (EWR) at the required stages. We email you the EWR number for your retailer. Our electricians carry out the required connection work and their visits are charged to you. Energex network work and retailer metering are separate stages.
When will power actually start flowing at my site?
Installation of the pole does not mean the supply is live. Network connection, metering and the required energisation steps must be completed. Energex and your retailer or metering provider confirm their appointments; we cannot guarantee their completion date.
What is our standard delivery area for temporary builders pole hire?
Standard-zone pole-truck delivery applies within 40 km of our Capalaba depot. The quote shows hire and delivery separately, with any distance surcharge calculated for your address. A suburb being in our service area does not mean it is inside the standard delivery zone.
Can I extend the hire if my project isn't finished?
Yes. Contact us before the expected end date to confirm the continued hire and applicable rate. The minimum hire still applies, and the agreed off-hire and collection arrangements should be confirmed with us.
How do Poles & Holes know to pick up the pole at the end of the job?
Contact us to arrange off-hire and collection; it is not automatic after 12 weeks. The temporary supply must first be safely disconnected or transferred, with the service wires and meter removed as required. Confirm the effective off-hire date with us.
What happens if we can't install the pole where you prefer?
We review access, underground services, the network connection and future work areas before agreeing on a position. If the proposed location is unsuitable, we discuss an alternative. Do not mark or excavate a position on the assumption that it has been approved.
Will the pole be delivered on the exact date I specify?
Your requested date helps us plan the job. We confirm an installation window after quote approval, site review and availability checks. The delivery appointment is separate from the network and meter appointments.
Are there any charges from the retailer?
Your retailer, network provider and metering provider may charge for their work and electricity account. These are separate from our pole hire and delivery. Ask the relevant provider for the current charges for your connection.
Can there be an unforeseen charge levied by Energex for a 3-phase connection?
Additional network work or a non-standard connection can affect the price. Ask Energex and the relevant contractors to confirm the required work and charges before you commit. Our three-phase hire price does not include every possible network upgrade.
Can we start the connection process early with Energex?
Yes. We arrange the connection application during planning and lodge the EWR when the relevant electrical work is ready. The accepted connection offer and EWR are separate steps. We send you the EWR reference once it is lodged.
Do you provide the meter box?
Yes. The pole is supplied with a meter box and the quoted switchgear. A meter box is not the electricity meter: your retailer or metering provider arranges the meter and required energisation steps.
How do I advise the Retailer that I wish to open an account?
Contact your chosen retailer and request an account for a temporary builder’s supply at the site address. Ask which connection references and service orders it needs. We confirm the information and responsibilities relevant to your installation.
Is there a different procedure for Underground Power Poles?
Yes. Our electrician attends for the required underground connection work and the visit is charged to you. We review the network pillar and cable route. Our standard arrangement places the pole within 1 m of the pillar; a different position needs separate assessment and an agreed scope. Equipment hire and delivery remain separate items.
What is a Retailer?
Your electricity retailer manages the account, electricity billing and relevant service orders. It also coordinates metering through its provider. Energex operates the local electricity network; the two organisations have different roles.
Which Retailer do I use?
Choose a retailer that can provide a temporary builder’s supply account at your address. Confirm its account requirements, charges and metering arrangements directly before scheduling work.
Are temporary power poles safe?
They need the right installation, electrical testing and ongoing site management. Keep the pole, stays and access areas clear, follow the site’s electrical safety procedures and report damage. A pre-hire test does not remove the site’s ongoing inspection and testing duties.
Do temporary power poles comply with safety standards?
Our poles are built and tested by licensed electricians before delivery. The installation and use must also meet the applicable wiring, construction-site and network requirements. Confirm site-specific checks and records with the responsible licensed electrical contractor.
What happens if I think the pole is faulty?
Stop using the affected equipment, keep people away and contact us and the responsible licensed electrical contractor. Do not open, alter or repair electrical equipment yourself. If there are fallen wires or immediate danger, keep clear and call emergency services.
What happens if we need to erect scaffold near the pole?
Raise the scaffold plan before work starts. The stay footprint and our working-clearance guide are not electrical-line exclusion distances. Have the work assessed and obtain Energex Safety Advice where required before work could enter a powerline exclusion zone.
Who is responsible for the testing of the Safety Switch after the valid to date on the sticker in the meter box?
The business using the equipment must arrange the inspections and testing required for its site and equipment. Do not wait for a hire-company test label to expire before checking those duties. Ask a competent person or licensed electrical contractor to confirm the schedule and maintain the records.
Can installing a Builders Temporary Power Pole save you money?
For a knockdown rebuild, discuss whether the existing supply can be transferred instead of abolished. The available connection path and any cost difference depend on the site and provider requirements. We do not promise a fixed saving.
Does traffic control cost extra?
No. Traffic control for the Energex connection is free, but it extends the connection timeframe. We identify the likely requirement during site review. Any electrician visit and other provider charges are separate from traffic control.
What about jobs on a busy road?
Tell us about the road and access conditions during quote review. Traffic control for the Energex connection is free, but the typical network wait is around 6–8 weeks where it is required, instead of around 2–4 weeks. These are estimates, and retailer metering is a separate stage.
What are your timeline guidelines?
Allow for installation, network connection and then metering. Typical Energex network timing is around 2–4 weeks after the required paperwork is ready, or around 6–8 weeks where traffic control is needed. These are estimates, not a guaranteed power-on date; confirm appointments with the relevant providers.
What if there is no permanent connection required to a building and you just want to get rid of the pole?
Ask your retailer how to arrange disconnection or supply abolishment for the temporary supply. Once the relevant provider has removed the service wires and meter as required, contact us to confirm off-hire and collection. Do not disconnect or remove the pole yourself.
Prepare access and pole placement, confirm connection responsibilities, and record ongoing electrical checks. A planning checklist, not a compliance certificate.