Power Pole & Security Camera Hire in Gold Coast

Temporary and permanent power pole hire for Gold Coast builders, with Energex paperwork handled and 48-hour delivery from our Capalaba depot. Security cameras available as an add-on to your power pole hire — standalone cameras and portaloo hire are by enquiry only.

Updated May 2026

Next Day Delivery
Local Energex Approved
Compliance Sorted
Map preview
Depot Location
Dispatching to Gold Coast daily
12+ Years
Servicing SEQ
15,000+
Sites Powered
4,000+
Active Accounts
4.9/5
Google Rating

Temporary & Permanent Power Poles in Gold Coast

The Gold Coast is one of South East Queensland's fastest-growing construction corridors. From major developments in Robina, Coomera and Pimpama to residential builds across Burleigh Heads, Nerang and Ormeau, there's constant demand for reliable temporary power. Poles and Holes has been supplying builders' site power poles across the Gold Coast since 1960, with our own crane trucks and in-house electricians handling every step from Energex paperwork to on-site installation.

We deliver temporary and permanent power pole installations to sites across the Gold Coast from our Capalaba depot, with most poles installed within 48 hours of booking. A travel surcharge of $10/km applies beyond our standard 40 km zone to cover the return trips involved. Security cameras are available on the Gold Coast as an add-on to a power pole hire — they mount directly on the pole for clean power. Standalone camera hire (no pole) and portaloo hire on the Gold Coast are by enquiry only — call (07) 3367 2237 or email admin@polesandholes.com.au and we'll let you know if we can support your site.

Technical Specifications

Power Poles

Pole Height7.2m (Overhead) / 4.5m (UG)
Amperage40A - 80A Single Phase
Outlets2x 15A + 1x 10A Standard
Lead In Cable25mm XLPE Included

When to book your hire?

Timing is key for site establishment. Here is the recommended schedule for Gold Coast builds.

Planning ahead ensures your Gold Coast construction site meets all compliance requirements before work begins. Here's the recommended order for booking site services.

2 Weeks Before

Book Your Pole

Energex applications take 3–5 business days to process. Book your temporary power pole early to avoid site-start delays.

1 Week Before

Confirm Site Access

Confirm crane truck access and the exact pole location with our team. Underground service markouts should be complete.

Install Day

Pole Installed

Our crew installs the pole, meter box and connection gear in a single visit. Tested and tagged on the spot.

Lockup

Off-Hire & Pickup

Once permanent power is connected to the house, call us and we'll arrange off-hire and collection of the temporary pole.

Our Reviews

Trusted by the industry

Google Review
Excellent service and really helpful in coordinating the delivery and pick up.
Sonya Keenan
Google Review
Google Review
Great friendly service, Communication was great!
Buddy Randall
Google Review
Google Review
I honestly did not expect this toilet to be suited for royalty. It has a light, it has hand soap, it has toilet paper and it smells great.
Nadine Chapman
Google Review
Google Review
1 call was all it took to go from no power to a pole in an agreed spot with metered power. All happened within the time frame quoted.
Vanessa McGee
Google Review
Google Review
Awesome company, they delivered further out just for me! The facilities are pristine!
Mel's Outdoor Shenanigans
Google Review
Google Review
Poles and Holes had a temp power pole on our site when our builder went into receivership. The team helped out as much as they could.
Rob M
Google Review
Google Review
Perfect service, couldn't recommend a better experience, helped me hitch up the trailer and fix my hitch pin.
Morgan
Google Review
Google Review
The team at Poles and Holes has been super-helpful, I was entirely new to the process of getting a temporary power pole installed.
Jeremy Matthews
Google Review
Google Review
Best temporary builders pole installers in Brisbane. Quick, reliable, and always professional.
Josh Blake
Google Review
Google Review
Would highly recommend these guys. They know what they're doing and get the job done right.
Sarah Mac
Google Review
Google Review
I have used Poles & Holes a number of times now and they have always been reliable and professional. Highly recommend.
Lisa Bourke
Google Review
Google Review
When our builder went into liquidation, Poles & Holes helped us through a difficult time. They were understanding and flexible.
Soren and Nova Madsen
Google Review
Google Review
Always prompt and professional service!
Maria O'Brien
Google Review
Google Review
Always a pleasure dealing with the team at Poles & Holes. Professional service every time.
Innovative Design & Build Group
Google Review
Google Review
I had a pole and toilet for my project. Both were installed on time and picked up promptly when I asked. Great service, will use again.
Allan Donovan
Google Review
Google Review
Fabulous service from these guys. They have been helping us for years and always deliver on time with no fuss.
Jason Neale
Google Review
Google Review
Having never been through building before, their team made the temporary power process simple to understand. Three thumbs up!
Alex
Google Review
Google Review
Professional and friendly staff. They made the whole process simple from start to finish. 100% would recommend.
Dennis Daniel
Google Review
Google Review
Hired a toilet for a party. It was delivered clean and on time. Very easy to deal with.
Jodie Harold
Google Review

Why Gold Coast builders choose us

Not sure which products suit your project? Compare our core hire options side by side to find the right combination for your Gold Coast build.

FeaturePoles & HolesOthers
Energex Form 2 Paperwork Handled
Own Crane Truck Fleet on Gold CoastContractors
Same-Day EWR Lodgement2–3 Days
In-House Licensed ElectriciansSubbed Out

How it works

We've streamlined the hire process for local builders.

Getting started is simple. Our team handles everything from initial consultation to on-site installation, so you can focus on your build.

1. Quote Online

Request a temporary or permanent power pole quote online or by phone. We respond within 2 hours during business hours.

2. Energex Paperwork

We lodge your Energex Form 2 (Electrical Work Request) on your behalf and coordinate site access with you.

3. Gold Coast Install

Our crane truck arrives on site. We install the pole, fit the meter box, RCD and outlets — typically within 2–3 hours.

4. Energex Connection

Energex connects the service line within 5–10 business days of install. When you're done, call us for off-hire and pickup.

Servicing All 31+ Gold Coast Suburbs

We deliver directly to sites across Gold Coast and surrounding areas. Same-day dispatch is available for most suburbs listed below.

ArundelAshmoreBenowaBiggera WatersBroadbeachBundallBurleigh HeadsCarraraCoolangattaCoomeraCurrumbinElanoraHelensvaleHope IslandMermaid BeachMiamiNerangOrmeauPalm BeachPimpamaRobinaRunaway BaySouthportSurfers ParadiseOrmeau HillsUpper CoomeraOxenfordPacific PinesMudgeerabaVarsity LakesLabrador

Nearby Service Areas

Building across Gold Coast's borders? We cover neighbouring regions from the same Capalaba depot.

Location FAQs

Once Energex has processed the Electrical Work Request (EWR) — typically 3 to 5 business days for a Gold Coast site — Poles and Holes can usually install a temporary builders power pole within 48 hours from our Capalaba depot. We lodge the EWR on your behalf so you don't need to deal with Energex directly. Drive time from Capalaba to most Gold Coast suburbs runs 50 to 70 minutes; hinterland sites in Mudgeeraba, Nerang or Maudsland add another 15–30 minutes. Once the pole is installed Energex connects the network within 5–10 business days, then your retailer's meter provider attends a few days later to fit the meter — power flows once that meter is in. For urgent Gold Coast jobs call (07) 3367 2237; same-week installs are routine and same-day is occasionally possible.

Yes — Poles and Holes installs temporary and permanent power poles across the Gold Coast Hinterland, including Nerang, Mudgeeraba, Maudsland, Tamborine Mountain, Canungra and the Coomera valley. The Hinterland sits beyond our standard 40 km delivery zone, so a $10 per kilometre distance surcharge applies on top of the standard hire rate — that fee covers the four trips every pole hire involves: delivery to site, our return to depot, pickup at end of hire, and our return again. Steep, narrow or restricted-access Hinterland sites are common, so our crew assesses crane reach on the day and chooses the safest practical placement; we'll flag any access risk at quote stage. Same Energex network applies as the rest of the Gold Coast, so the connection paperwork is identical — just longer drive times to factor in.

Yes — but the answer depends on which product. Security camera hire on the Gold Coast is available as an add-on to a temporary or permanent power pole hire from Poles and Holes; the camera mounts directly on the pole for clean power, and a $10/km travel surcharge applies beyond our standard 40 km zone (Capalaba to most Gold Coast suburbs is 50–70 minutes drive time, hinterland adds 15–30 minutes). Standalone camera hire on the Gold Coast (no pole) is by enquiry only — long-term hires (84-day minimum) are usually viable, short-term jobs need to slot into an existing route. Portaloo hire on the Gold Coast sits outside our standard short-term delivery zone, so portaloos are by enquiry only too — call (07) 3367 2237 or email admin@polesandholes.com.au with your site address, dates and what you need, and we'll let you know if we can cover the job.

Every Gold Coast temporary builders power pole from Poles and Holes ships fully kitted out from our Capalaba depot: compliant meter box, RCD safety switch, standard 15A and 10A outlets, full earthing, and test-and-tag certification to Australian Standards AS/NZS 3000 (Wiring Rules) and AS/NZS 3012 (Construction and Demolition Sites). The pole complies with the Queensland Electricity Connection Manual; the test tag stays attached as your evidence of compliance for the first 6 months, after which retesting is the hirer's responsibility. We handle the Energex Form 2 EWR lodgement on your behalf so the network connection is locked in within 5–10 business days of installation, and we email you the EWR number the same day for your electricity retailer account setup. Stayed, stayless, 3-phase and underground variants all available depending on site requirements.

Start your project.

Get a custom package quote for your Gold Coast site in minutes.

Start Your Order