City of Gold Coast · 54 km from our depot · Energex network
Temporary power pole hire on the Gold Coast
We install temporary and permanent power poles across the Gold Coast, from Ormeau and Coomera through to Burleigh, from our depot in Capalaba. Delivery is $350 plus $10 a kilometre past 40 km by road, plus GST. Portaloos and solar cameras on the Gold Coast are by enquiry.
Jump to
What we supply on the Gold Coast
Temporary power poleWe install it and lodge the Energex paperwork.63A single-phase, or 63A per phase for three-phaseOverhead or underground connectionBuilt and certified at our depotfrom$600+ GST, 12 weeks' hire
Permanent power poleSupplied and installed for new homes and pole replacements.Galvanised steel, powder coat optionalWith or without a pre-wired meter boxFooting cage suppliedfrom$1,850+ GST, plus delivery
Portaloos and solar cameras by enquiry
Hire prices exclude delivery, which depends on your address. See delivery below.
Building on the Gold Coast
Building on the Gold Coast runs from the northern growth corridor at Pimpama, Coomera and Ormeau to Robina, with homes going up through Nerang and Burleigh Heads.
Temporary poles carry a build from slab to handover, and permanent poles suit new homes and pole replacements after a defect notice. Portaloos and solar cameras are by enquiry here, so ask when you send the address.

How hire works on the Gold Coast
- 01
Send your site details
Your address, dates and whether the street supply is overhead or underground. For mainland addresses within the product's online delivery zone, the form shows the delivery fee. For islands or sites outside that zone, our office confirms availability and delivery pricing.
- 02
We deliver and install
On the date confirmed in your quote. Our truck needs a clear path at least 3 m wide, so tell us about gates, slopes and overhead obstructions.
- 03
We lodge the Energex paperwork
We lodge the Connect Application and EWR and email you the EWR number. Your retailer uses it to book the connection and the meter, and Energex usually connects the pole 2–4 weeks after the EWR.
- 04
Off-hire and pickup
When you finish, contact us to off-hire and we collect the equipment. Permanent poles are bought and stay on site.
Book power at least 4 weeks before you need it. Energex usually connects the pole 2–4 weeks after the EWR.
Long-term hire is invoiced monthly after delivery. Builders running several sites can apply for a credit account, normally on 30-day terms. Apply for an account
Priced by the kilometre past the zone
Southern suburbs such as Currumbin and Coolangatta can be more than 100 km by road, past what the quote form books for poles. Send an enquiry for those.
Gold Coast suburbs we deliver to
Arundel, Ashmore, Benowa, Biggera Waters, Broadbeach, Bundall, Burleigh Heads, Carrara, Coolangatta, Coomera, Currumbin, Elanora, Helensvale, Hope Island, Labrador, Mermaid Beach, Miami, Mudgeeraba, Nerang, Ormeau, Ormeau Hills, Oxenford, Pacific Pines, Palm Beach, Pimpama, Robina, Runaway Bay, Southport, Surfers Paradise, Upper Coomera, Varsity Lakes
★★★★★
“Great friendly service, Communication was great!”

Gold Coast questions
How much is power pole delivery to the Gold Coast?
Can I hire a portaloo on the Gold Coast?
Which network connects Gold Coast poles?
Which Gold Coast suburbs do you deliver to?
Send your Gold Coast site address
Add your dates, and we will confirm the equipment, the delivery cost and the next available date.