Underground 80 Amp

The initial cost to install an underground pole is $900 + GST. This is made up of install pole, submit connection paperwork to Energex, pick up pole, 12 weeks rent and a $100 allowance to our Electrical Contractor to feed the cable up into the Energex green pillar and to check there is sufficient fuses available for the new connection.

Only a licensed electrical contractor with a safety observer is allowed to remove the cover from the pillar to pull our cable from the pole into the pillar to make ready for Energex to complete the connection. If his invoice is higher than the $100 allowance due to distance travelled or site specific issues then we bill the difference to you.

Phone 33672237 for install options and pricing.